About this app
About Book Of Gods
A massive steel truss weighing about 180,000 pounds has been lifted into place at Durango Casino in southwest Las Vegas as construction reaches the halfway point of its $385 million expansion.
The huge structure, measuring nearly 140 feet long and 20 feet tall, was installed Friday, September 18, as part of the second expansion of Station Casinos’ Durango property.
Suffolk Construction, the project’s general contractor, used a crane weighing roughly 650,000 pounds for the lift, with a second crane assisting with the operation.
About Book Of Gods
Initial reaction from investors was largely unfavourable. Genius shares plunged 13% on 18 Sept., falling 17% for the week. The data provider closed the session at $5.64 per share, well below the $6.19 price when it announced the Legend acquisition in February.
The launch of Prediction.com comes amid a strategic integration phase following Genius Sports’ acquisition of Legend.
It coincided with the beginning of the NFL season in the US, viewed as a peak commercial period for sports data monetisation. Genius also maintains partnerships with DraftKings and FanDuel, both of which signed extensions to remain as NFL partners ahead of this season.
About Book Of Gods
Far fewer travelers are arriving in the casino town by air this year. Harry Reid International Airport reported 30.2 million passengers through July—a 6.9% drop from the same period in 2025—with international traffic down nearly 9%.
The LVCVA and Harry Reid International Airport have not yet released their August reports. Truist Securities analyst Barry Jonas isn’t expecting a major rally.
Jonas projected on Friday (Sept. 18) in his Las Vegas room survey a soft third quarter. Jonas said Q3 rates for Las Vegas Strip casino rooms are “mostly lower,” with MGM Resorts rooms down 9% and Caesars Entertainment down 11%.